Duct transition element, size 1 to size 2
Product description
CABSYS Rail NG duct transition element, size 1 to size 2 is required if the size changes in the horizontal course of the cable duct route. The components enable an interlocking connection of the different duct geometries.
0,00 EUR
inkl. Mehrwertsteuer
zzgl. Versandkosten
inkl. Mehrwertsteuer
zzgl. Versandkosten
Technical data
Item number | 000615 |
Length in mm | 40 |
Width in mm | 339 |
Height in mm | 190 |
Weight in kg | 1 |
Material | GFK/UP GM 203 |
Scope of supply | Sales unit complete with fasteners |